Industrial boiler procurement is moving from equipment-price procurement to lifecycle performance, flexibility and future readiness. For decades, industrial boiler procurement has been built around a familiar set of parameters such as steam capacity, operating pressure, fuel type, efficiency, emissions, delivery schedule, warranty and purchase price. Those parameters will remain important. The boiler should also not be evaluated in isolation. The actual cost of steam depends on the wider steam system like condensate recovery, feedwater temperature, blowdown, heat recovery, steam distribution losses and process demand. An RFQ evaluated purely at the boiler-package level can miss significant cost and efficiency drivers that sit downstream of the boiler itself. However, a boiler purchased in 2030 could remain in operation for decades. During that period, the economics of fuel, electricity, emissions compliance, digital systems and maintenance could change substantially.

This raises an important procurement question: “If the asset is expected to operate for decades, should an RFQ issued in 2030 be designed around today’s operating assumptions?” The answer may require a different approach. Rather than treating the boiler as a piece of capital equipment, procurement teams could increasingly evaluate it as a long-term energy, operational and technology asset. The 2030 RFQ should go beyond asking, “What is the price and rated efficiency of the boiler?” It should ask, “How will this boiler perform, cost, adapt and remain supportable throughout its operating life?”

From a boiler specification to a lifecycle specification

A conventional RFQ places heavy emphasis on technical specifications and upfront commercial terms. A future-oriented RFQ may expand the evaluation to cover the whole life of the asset.

Figure 1: Illustrative boiler operating life

Source: ARXIV [10]

Table 1: 2030 RFQ addition

DimensionWhat the RFQ should add
PerformanceResults across the actual load profile, not one rated point
EnergyLifecycle energy consumption
FuelFuel flexibility and conversion options
EnvironmentEmissions performance and future regulatory requirements
DigitalMonitoring, data access and cybersecurity
OperationsMaintenance, availability and retrofit options
SupplierLong-term support commitments

Sources: ABMA, US DOE, IEA 2025, Indian Boilers Act 2025, ISA [3], [1], [5], [7], [6], [13]

This does not mean every buyer should specify hydrogen capability, electrification, or advanced digital systems. Instead, the RFQ should require suppliers to quantify the implications of these options, so procurement can decide based on the site’s actual operating profile. The objective is not to predict the future, but to ensure that the boiler purchased in 2030 is not constrained by assumptions that were valid only at the time of purchase.

1) Stop asking only for rated efficiency

A supplier may quote a headline thermal or combustion efficiency, but industrial boilers do not necessarily run continuously at rated load. Actual demand fluctuates because of:

  • Production schedules and seasonal demand
  • Plant shutdowns and batch processes
  • Start-up and shutdown cycles
  • Changes in steam consumption
  • Boiler configuration and modularity
  • Steam quality requirements

Some boiler manufacturers have highlighted the importance of expected service duty, capacity factor and load profile when considering boiler design life, operating costs and maintenance. [3]

A 2030 RFQ could request guaranteed performance at 25%, 50%, 75%, and 100% load, along with the assumptions used to calculate each value. The chart below shows why: two bids can share an identical headline number and still burn very different amounts of fuel.

Figure 2: Same rated efficiency, different real-world performance (illustrative)

Sources: Beroe Analysis

Suppliers should state guaranteed efficiency and fuel consumption at 25%, 50%, 75% and 100% load, with test standard and assumptions. [12] Suppliers can then be compared on operating performance rather than a single headline number.

2) Make lifecycle cost more important than purchase price

The largest financial mistake in boiler procurement can occur when the purchase price receives more attention than the cost of operating the asset. The procurement should consider explicitly consider lifecycle cost rather than first cost. Its examples evaluate lifetime energy consumption and cost and use boiler lifetimes of 20–25 years. [1]

The cheaper bid is not always the cheaper boiler.

Figure 3: Illustrative 20-year cost index

Sources: US DOE [1]

For a future RFQ, the commercial comparison moves from boiler price + installation to Total Cost of Ownership:

Table 2: TCO cost framework

Cost elementIncluded in TCO
CAPEXEquipment, installation, commissioning
Running costsFuel, electricity, water, chemicals
MaintenanceRoutine maintenance, spare parts, major overhauls
Digital and complianceSoftware or digital services, compliance costs
RiskExpected downtime
Credit (−)Energy recovery benefits

Sources: US DOE, Indian Boilers Act 2025 [1], [7], [6]

Suppliers should also disclose the assumptions behind their TCO calculations so bids can be compared on a consistent basis:

Table 3: TCO assumptions suppliers should disclose

Assumption to discloseWhy it matters
Annual operating hoursScales every running cost
Load profileDetermines real efficiency
Fuel priceUsually, the largest cost line
EfficiencyDrives fuel consumption
Maintenance frequencyAffects cost and availability
Major overhaul timingCreates large future cash outflows
Expected component lifeSets replacement timing

3) Treat fuel flexibility as an option, not an assumption

Fuel strategy could become one of the most difficult variables for a boiler purchased in 2030. Natural gas may remain dominant for many applications, but industrial energy strategies are also evolving around electrification, renewable electricity, biomass and potentially hydrogen or other alternative fuels.

The electricity uses for industrial process heat to increase significantly through 2030, while electric boilers and other electric technologies are already commercially available for relevant applications. It also identifies energy security and reduced exposure to volatile fossil-fuel prices as potential benefits of electrification. [5], [13]

At the same time, hydrogen-blended boiler operation is being actively investigated. [9] This does not mean every boiler should be hydrogen-ready. Procurement should ask suppliers to quantify the options:

Table 4: Fuel flexibility RFQ components

RequirementSupplier response
Current fuel capabilitySpecify
Dual-fuel capabilitySpecify
Alternative-fuel capabilitySpecify
Hydrogen blending capability (where applicable)Specify
Burner modification requiredCost + downtime
Controls modificationCost + downtime
Efficiency impactQuantify
Emissions impactQuantify
Future conversion costProvide as priced option
Warranty implicationsSpecify

Sources: MDPI [9]

This creates what could be called fuel flexibility as an option value. The buyer does not have to pay for every future capability today, but should understand: “What will it cost if the fuel strategy changes five or ten years after commissioning?”

4) Compliance today should not be the only regulatory question

A boiler purchased in 2030 could operate well beyond 2040, so compliance needs to be considered over the asset’s lifecycle. India offers a useful example.

Table 5: Regulatory developments in India

Development in IndiaImplication for buyers
Boilers Act, 2025 came into operation on 1 May 2025New legal framework governs the asset from day one
2026 consultation with states, manufacturers, users and third-party inspection authorities, covering ageing-boiler remnant-life assessment and advanced boiler technologiesExpect attention on long-term condition assessment
2026 advisory encouraging fuel diversification and alternate fuelsFuel strategy is a policy topic, not only a cost topic
Packaged-boiler Standards & Labelling programme with 1–5 star ratings based on thermal efficiency; increasing penetration projected through 2033Efficiency information becomes easier to compare, and expectations may rise

Source: Indian Boilers Act, PIB [8], [7]

A future RFQ could request current regulatory compliance, guaranteed emissions performance, efficiency certification and testing methodology, plus upgrade requirements, retrofit cost estimates and expected downtime for major upgrades. The objective is not to predict future regulations but to understand the cost of adapting to them.

5) Digitalization should become part of the RFQ

The boiler may remain a thermal system, but the way it is monitored and operated is increasingly digital. The testing of an advanced boiler combustion-control and monitoring system demonstrates continuous monitoring of oxygen, carbon monoxide and nitrogen oxide concentrations, with real-time performance feedback. [2]

Table 6: 2030 RFQ data architecture:

Operational dataConnectivityAnalytics
Steam flowPLC / SCADA integrationEfficiency monitoring
Steam pressureIndustrial communication protocolsAbnormal-condition detection
Fuel consumptionData exportCombustion optimization
Feedwater temperatureAPI availabilityPredictive maintenance
Flue-gas temperatureHistorian integrationPerformance trending
Oxygen concentration  
Burner firing rate  
Alarm history, operating hours, maintenance events  

6) The new procurement question: Who owns the data?

If the boiler generates years of operational data, the RFQ should settle the ownership and continuity

Table 7: Who owns the data? — Questions to settle up front

QuestionWhat the buyer needs
Who owns the data?Explicit contractual ownership
Can it be exported?Open formats and API access
Can it move to another platform?Portability without penalty
What if the supplier’s platform changes?Continuity and migration commitments
What happens when software support ends?Defined end-of-support policy
Can we operate without the supplier’s cloud?Local operation fallback

This matters because industrial control systems can have very long lives. IEC 62443-2-1:2024 explicitly recognizes that industrial automation and control systems can last more than 20 years and that legacy systems may eventually contain unsupported hardware and software. [6] The mechanical asset may still be operational even when its digital infrastructure becomes obsolete. [11]

A future RFQ should consider hardware (controllers, sensors and panels), software (firmware, applications and platforms), and cybersecurity (patches and vulnerability management) lifecycles, rather than treating software as an incidental component of the boiler package.

7) Cybersecurity moves into boiler supplier qualification

If a boiler is connected to a plant’s operational technology environment, remote access and software support become procurement considerations. IEC 62443 provides a framework for cybersecurity of industrial automation and control systems and specifically addresses requirements for asset owners. [6]

Table 8: Cybersecurity requirements to ask suppliers to specify

AreaAsk the supplier to specify
AccessRemote-access architecture, authentication requirements, user-access controls
UpdatesSoftware-update procedures, security patch support
Risk managementVulnerability-management process, backup and recovery arrangements
LifecycleEnd-of-support policy, data storage arrangements

Source: IEC [6]

If this boiler is expected to operate for 20 years, how will the supplier support its digital systems for 20 years? That is very different from asking whether the boiler has a modern control interface at the time of purchase.

8) Move from warranty to measurable performance

Traditional boiler contracts emphasize delivery, commissioning and warranty. A future model could add measurable operational commitments, depending on the application.

Technical specification
What the supplier must build
Performance specification
What the boiler must deliver
Lifecycle specification
How that performance must be maintained

Table 9: Possible performance commitments

Possible commitmentExample measure
Steam outputRated tons/hr at defined pressure and temperature
EfficiencyVerified at agreed load points
Fuel consumptionPer unit of steam delivered
AvailabilityPercentage of scheduled operating hours
EmissionsGuaranteed limits under stated conditions
Response timeLoad-following or start-up time
Spare-parts availabilityCommitted lead times
Service responseHours to site attendance

Source: Beroe Analysis, ASME [4]

The concept is not to eliminate warranties but to complement them. ASME’s performance-test framework already provides standardized approaches for testing and reporting, which can help establish objective acceptance criteria. [4]

9) Ask suppliers what happens if the energy strategy changes

Perhaps the most important addition to a 2030 RFQ is a future-conversion section. Instead of assuming the energy environment stays unchanged, procurement teams should ask suppliers to price optional scenarios.

Table 10: Future-conversion scenario

ScenarioQuestion for the supplier
A. Existing fuel strategy continuesWhat is the expected lifecycle cost?
B. Alternative fuel becomes availableWhat equipment changes are required?
C. Greater electrification becomes attractiveCan the system operate within a hybrid steam-generation architecture?
D. Emission requirements become more stringentWhat retrofit would be required?

Source: Beroe Analysis

For each scenario, the supplier should complete the same response template, which makes the cost of adaptation visible before the contract is awarded:

Table 11: The 2030 RFQ: What changes?

AreaTraditional RFQ2030-oriented RFQ
Cost basisEquipment priceLifecycle cost
EfficiencyRated efficiencyEfficiency across load profile
CapacityMaximum capacityActual load profile + turndown
FuelSingle fuel specificationCurrent + potential future fuel options
ComplianceCurrent complianceCurrent compliance + upgrade pathway
ControlsBasic controlsDigital performance monitoring
SoftwareSupplier softwareData ownership + interoperability
CommitmentsWarrantyMeasurable performance requirements
MaintenancePreventive maintenanceLifecycle reliability strategy
SupportEquipment supportLong-term service and software support
QualificationTechnicalTechnical + digital + cybersecurity

The objective is not to make RFQs unnecessarily complicated. It is to make them better aligned with the economic life of the asset.

Table 12: Proposed boiler procurement scorecard

A buyer could structure its evaluation around several dimensions:

Evaluation dimensionQuestion procurement should answer
Technical performanceDoes the boiler meet the required steam profile?
Load performanceHow does efficiency change with load?
Lifecycle economicsWhat is the 10–20 year TCO?
Energy efficiencyWhat fuel consumption is guaranteed?
Fuel flexibilityWhat future fuel options are technically feasible?
EmissionsWhat is guaranteed and under what conditions?
Digital capabilityWhat data and analytics are available?
CybersecurityHow will the connected system be protected and supported?
ReliabilityWhat availability and service commitments exist?
Future readinessWhat happens if the energy or regulatory environment changes?
Supplier capabilityCan the supplier support the asset throughout its life?

The exact weighting should remain site-specific. A refinery, pharmaceutical plant, food manufacturer and textile plant will not have identical requirements.

What procurement can start doing today

The 2030 RFQ does not require procurement teams to wait until 2030. Several changes can be introduced into current tenders.

  1. Ask for efficiency at multiple load levels. Do not rely solely on the rated-efficiency figure.
  2. Require standardized TCO assumptions. Make suppliers disclose the assumptions behind lifecycle-cost calculations.
  3. Request future fuel-conversion options. Even when you do not intend to convert, understand the technical and economic implications.
  4. Separate compliance from future adaptability. Ask what is compliant today and what can be upgraded later.
  5. Add digital requirements. Specify the data you need rather than accepting whatever the supplier chooses to expose.
  6. Include cybersecurity in supplier qualification, particularly where boiler controls connect to plant OT networks.
  7. Request lifecycle-service assumptions. Understand spare parts, major maintenance, software support and service response.
  8. Ask for retrofit costs as optional items. Create transparency around future adaptation costs before the boiler is purchased.

Conclusion: The RFQ needs to outlive the boiler’s first fuel strategy

The industrial boiler of 2030 does not necessarily need to be hydrogen-powered, electric, AI-enabled or fully autonomous. Those outcomes will depend on application, economics, regulation, infrastructure and available technology at each site.

What procurement can control is the quality of the specification and the visibility of future risks. A boiler purchased in 2030 could operate for decades, during which fuel markets can change, energy systems can evolve, regulations can tighten and digital platforms can become obsolete.

So, the future RFQ should not simply ask, “What is the most efficient boiler we can buy today?” It should ask, “What boiler system gives us the required performance today while preserving the ability to adapt tomorrow?” The biggest shift may not be from gas to hydrogen, or from mechanical to digital controls. It may be from buying equipment to buying lifecycle flexibility. The 2030 boiler RFQ should not attempt to predict the next 20 years, but it should ensure that the buyer is not locked into today’s assumptions for the next 20 years.

References

[1] Purchasing Energy Efficient Boilers [Online]. Available: https://www.energy.gov/cmei/femp/purchasing-energy-efficient-boilers [Accessed 29 September 2026].

[2] Boiler Combustion Control and Monitoring System [Online]. Available: https://www.energy.gov/cmei/femp/boiler-combustion-control-and-monitoring-system [Accessed 29 September 2026].

[3] Specification Design Life Requirements and Implications Relative to Boilers [Online]. Available: https://www.abma.com/assets/docs/Tech_Resources/2015%20-%20specification%20design%20life%20requirements_2010.pdf [Accessed 29 September 2026].

[4] Performance Test Codes [Online]. Available: https://www.asme.org/codes-standards/publications-information/performance-test-codes [Accessed 29 September 2026].

[5] Renewable Heat [Online]. Available: https://www.iea.org/reports/renewables-2025/renewable-heat [Accessed 29 September 2026].

[6] Understanding IEC 62443 [Online]. Available: https://www.iec.ch/blog/understanding-iec-62443 [Accessed 29 September 2026].

[7] The Boilers Act, 2025 [Online]. Available: https://prsindia.org/files/bills_acts/acts_parliament/2025/The_Boilers_Act,_2025.pdf [Accessed 29 September 2026].

[8] Packaged Boiler under BEE’s S&L Program [Online]. Available: https://static.pib.gov.in/WriteReadData/specificdocs/documents/2024/mar/doc202431316701.pdf [Accessed 29 September 2026].

[9] Numerical Simulation and Field Experimental Study of Combustion Characteristics of Hydrogen-Enriched Natural Gas [Online]. Available: https://www.mdpi.com/2227-9717/12/7/1325 [Accessed 29 September 2026].

[10] Multi-model assessment of heat decarbonization options in the UK using electricity and hydrogen [Online]. Available: https://arxiv.org/pdf/2206.02483 [Accessed 29 September 2026].

[11] Control Updates Line Longevity [Online]. Available: https://www.pattiengineering.com/blog/controls-upgrades-line-longevity/ [Accessed 29 September 2026].

[12] Determining & Testing Boiler Efficiency for Commercial/Institutional Packaged Boilers [Online]. Available: https://www.abma.com/assets/docs/Tech_Resources/2015%20-%20commercial_boiler_efficiency.determine.test_2008.pdf [Accessed 29 September 2026].

[13] Energy Efficiency 2025 [Online]. Available: https://www.iea.org/reports/energy-efficiency-2025/industry [Accessed 29 September 2026].

Author

Goutham CB

Senior Analyst, Beroe

LinkdIn
Goutham is a procurement analyst at Beroe, with more than 10 years of industrial experience and has worked on various CapEx and MRO reports.

Faishal Ahmed

Director – Industrial Steam and Thermal Engineering Consultancy, Electro-Mech Engineering

LinkdIn
Faishal Ahmed is an industrial steam and thermal engineering professional with 15+ years of experience in industrial steam boilers, steam systems, and energy-efficiency optimization. He provides strategic and technical consulting and regularly writes on boiler efficiency, steam-system performance, and industrial energy management.
Related Reading

Featured Image

18 Nov, 2026

EU CRC anti-dumping duties

Featured Image

16 Nov, 2026

Middle East Conflict Impact Assessment November 2026

Featured Image

12 Nov, 2026

Rig reactivation vs. newbuild: Which offshore drilling strategy makes economic sense?